East London Line

Emico have secured the mechanical and electrical works at 4 stations on the East London Line.

 
 

 

Metronet Framework Agreement

Emico have secured a framework agreement with Metronet (LUL Nominee SSL) for the Supply of Electrical Services and equipment

 
 

 

New Cross Gate Depot

The installation is now entering a commissioning phase at both the Maintenance Shed and the Wheel Lathe Heavy Clean Shed.

New Cross Gate  
 

 

Digital Advertising on the Underground

Emico secured the second phase contract to replace, re-wire and refurbish the Digital Escalator Panels.

 
 

 

Stratford Station

Progress is now becoming noticeable for the paying public. 2 No lifts in the Western Subway have been commissioned and brought into use.

 
 

 

BAM Nuttall - Blackfriars Station

Blackfriars station is being completely re-furbished including a commercial office block development.

 
 

 

London Underground goes Digital

Emico are working with CBS Outdoor to prepare detailed designs for the XTP installation that is to be rolled out.

 
 

 

South London House

Electrical and Mechanical refurbishment of 4-story office block which is a Train Crew Accommodation block at Elephant and Castle.

 

 

Neasden Depot

Services provided include air conditioning, ductwork, plumbing, perimeter heating as well and a complete electrical fitout of both houses.

 

Morden Station SMEP & SFA

Complete electrical refurbishment; plumbing, air conditioning and comfort cooling refurbishment of station.

 

PSU: Southern Region Network Rail

Upgrade of 33kV oil filled feeders to 3 x 300mm2 XLPE singles with new pilot cables...

 

 

LUL: Tuffnell Park

A Section 12 station where the installation was hampered by the fact that there is no escalator at Tufnell Park Station...

 
 

 

CTRL St. Pancras

Working on behalf of Mowlem Engineering Power for RLE Emico carried out 3 separate contracts on this project..

 
 

 

Northam depot, Southampton

Working for Fitzpatrick Contractors Ltd, Emico were employed to install a 33kV feeder to the new Siemens Train Care facility...

 